Site Prep Checklist
A few simple steps before delivery day ensures a smooth placement. Review this checklist and contact us with any questions.
Level Pad
Concrete, compacted DG, or engineered base sized for the full footprint with 12"+ clearance on all sides. The tank must be fully supported across its entire base.
Clear Access
Truck route clear of low branches, wires, and obstructions. Gate and driveway width must accommodate our delivery vehicle. Let us know about any tight turns or narrow roads.
Setback & Code
Verify local setbacks, seismic anchoring requirements, backflow regulations, and fire-connection code with your local authority. We can help point you to the right resources.
Plumbing Plan
Confirm inlet/outlet size, pump tie-in location, and drain/overflow direction before we arrive. If you need a plumber, we can refer one from our trusted partners network.
Not sure about any of these? Call us at 559-577-6979 — we'll walk you through it.